Your SCADA speaks.
We translate.

ScadaSys™ sits above your control system and reads what is already there. It decides nothing on its own & changes nothing in your stack to get started.

See How It Works
Use Cases

Built for industries that do not sleep.

Features

What ScadaSys does
for your control room.

Three jobs it takes off your operators, using the SCADA data you already have.

12 ALARMS FIRINGPRESSURE · HIGHFLOW · LOW+ 10 MORE1 ROOT CAUSEPUMP-3 · BEARING WEAR

Alarms grouped together

One problem sets off dozens of alarms. ScadaSys groups them and shows you the single cause behind them.

RISK MODEL · PUMP-3FAILURE THRESHOLDNOWT-14d−30d+30dPREDICTED FAILUREBEARING WEAR · CONFIDENCE .89

Failures caught early

It tracks pressure, flow, and vibration, and warns you weeks before a part is likely to fail.

DECISION LOGAPPEND-ONLY09:47SUPPRESSED 4 ALARMS09:32ADJUSTED SETPOINT SLM-0408:15FLAGGED VLV-08 · SERVICE07:52ROUTED FLW-07 TO QUEUE12,481 DECISIONS LOGGED

Decisions kept forever

Every alarm suppressed and setpoint changed is saved with the reason why, so new operators can learn from it.

Benefits

Why teams keep using ScadaSys.

What it means for your operators, your budget, and your audits.

DEPLOYED IN PRODUCTIONWATER · TREATMENTENERGY · GRIDMANUFACTURING · LINEEVERY SCADA SECTORLIVE SITES · NOT PILOTS

Trained on real plants

It learns from water treatment, substations, pipelines, and production lines, so it understands how your site actually runs.

MEASURED AT 12 MONTHSALARM VOLUME−80%ENERGY COST−44%DOWNTIME HOURS−78%CUSTOMER REPORTED · AUDITED

Results you can measure

Fewer alarms, lower energy cost, less downtime. All reported by customers and checked at twelve months.

ENGAGEMENT TIMELINEONBOARDWEEK 1GO-LIVEWEEK 3OPTIMISEMONTH 2ONGOINGALWAYSDEDICATED ENGINEERASSIGNED FOR THE FULL TERMNOT A TICKET QUEUE

Understands your Team

A continuous digital partner that learns your operation, adapts to your industry, and keeps surfacing better insights as your teams evolve.

Comparison

Why ScadaSys™?

See how ScadaSys™ compares to conventional SCADA monitoring dashboards.

Without ScadaSys™With ScadaSys™
How alarms arriveEvery alarm vs. root causeEvery alarm fires, unranked. A single upset trips seventeen tags and operators triage the wall by hand to find the one that matters.Cascades are correlated and suppressed at source. One actionable item surfaces with the cause already attached.
When you find outReact vs. forecastYou learn about a failure when it happens. Maintenance is unplanned, parts are expedited, and the crew is on overtime.Pressure, flow, vibration, and current draw are modelled continuously. Failures surface weeks out, with a confidence score.
How setpoints are chosenConservative vs. optimisedOperators hold a safe, conservative band because nothing tells them where the real margin sits. Efficiency is left on the table.Setpoints tune to the optimal band against live process conditions, and the margin being used is made explicit.
Where knowledge livesIn people vs. in the systemInstitutional knowledge sits with your most senior operators and walks out of the building at every retirement.Every corrective action is captured as long-term memory. The reasoning outlives the person who had it.
What it costs to adoptRip-and-replace vs. overlayA long consulting engagement and a control system replacement before a single number improves.Sits on top of the SCADA, PLCs, and RTUs you already run. Live in 5–10 days, nothing torn out.
How it agesStatic rules vs. learningFixed thresholds drift out of tune with the plant and degrade quietly until someone notices they are wrong.The model sharpens as it sees more of your operation. Accuracy improves with age instead of decaying.
How alarms arrive

Every alarm vs. root cause

Without ScadaSys™

Every alarm fires, unranked. A single upset trips seventeen tags and operators triage the wall by hand to find the one that matters.

With ScadaSys™

Cascades are correlated and suppressed at source. One actionable item surfaces with the cause already attached.

When you find out

React vs. forecast

Without ScadaSys™

You learn about a failure when it happens. Maintenance is unplanned, parts are expedited, and the crew is on overtime.

With ScadaSys™

Pressure, flow, vibration, and current draw are modelled continuously. Failures surface weeks out, with a confidence score.

How setpoints are chosen

Conservative vs. optimised

Without ScadaSys™

Operators hold a safe, conservative band because nothing tells them where the real margin sits. Efficiency is left on the table.

With ScadaSys™

Setpoints tune to the optimal band against live process conditions, and the margin being used is made explicit.

Where knowledge lives

In people vs. in the system

Without ScadaSys™

Institutional knowledge sits with your most senior operators and walks out of the building at every retirement.

With ScadaSys™

Every corrective action is captured as long-term memory. The reasoning outlives the person who had it.

What it costs to adopt

Rip-and-replace vs. overlay

Without ScadaSys™

A long consulting engagement and a control system replacement before a single number improves.

With ScadaSys™

Sits on top of the SCADA, PLCs, and RTUs you already run. Live in 5–10 days, nothing torn out.

How it ages

Static rules vs. learning

Without ScadaSys™

Fixed thresholds drift out of tune with the plant and degrade quietly until someone notices they are wrong.

With ScadaSys™

The model sharpens as it sees more of your operation. Accuracy improves with age instead of decaying.

FAQ

Frequently Asked Questions

The most common questions from control room managers, operators, and IT teams.

Standard industrial protocols: OPC UA, Modbus, and native drivers for major PLC and RTU manufacturers. There is no rip and replace. Most single-facility deployments are operational within 5–10 days.